July 15, 2012: Alan makes some headroom
July 15, 2012
Alan opened up the severely low ceiling in the guest bathroom which was only a few inches above the shower stall. Then proceeded to opening the wall/doorway of the master closet, and finally getting rid of the low mounted built-in fluorescent light fixture box above the master bathroom vanity.
Just 2 more weekends left to prep for drywall. Clock is ticking!
Sent from my iPad
Just 2 more weekends left to prep for drywall. Clock is ticking!
Sent from my iPad